The Seattle Seahawks
“Longevity and Excellence in the NFL”
Crawford principal David Murphy served as the project director for the planning, design, documentation, and construction of Lumen Field from 1996 to 2001. After founding Crawford Architects in 2001, David was sought after for his leadership, commissioned by the Seattle Seahawks to serve as the Architect of Record for multiple renovations and studies conducted during multiple off-seasons including:
- 2007 – Club and Suite Renovations
- 2008 – Branding and Environmental Graphics
- 2009 – Cadillac Club and Outdoor Terrace(s)
- 2010 – Feasibility Studies for Press Box | Suite Renovations
- 2011 – Vertical Circulation Improvements & Concourse Master Plan
- 2012 – South Endzone Feasibility Studies
- 2015 – South Endzone Expansion (Toyota Fan Deck)
- 2015 – North Endzone Expansion Concept Studies
- 2016 – North Plaza and Amphitheatre Master Plan
- 2017 – Updated Vertical Circulation Improvements Master Plan
- 2021– Mechanical Systems Condition Assessment & Program Planning Services.
- 2021– On-Call Architect
- 2024– Amazon & Verizon Touchless Concessions Design
- Present– FIFA 2026 World Cup Stadium Alterations
Lumen Field remains one of the premier facilities in the NFL and MLS to watch professional sporting events. Our work within the stadium has only enhanced the already daunting home-field advantage.
CLIENT
The Seattle Seahawks
LOCATION
Seattle, WA
SIZE
1.5M square feet, 69,000 Seats
CONSTRUCTION COST
$480M (cumulative of all Crawford-Lumen projects)
EXPERTISE
Stadiums & Arenas, Architecture, Interior Architecture, Brand Activation, Signage & Wayfinding, Convention, Hospitality, Mixed-Use, Retail & Entertainment